T-3 reinspection readiness scan
How Pip flags pre-inspection prep issues three days out from any scheduled inspection.
Reinspection-Prevention runs every weekday morning, three days before any scheduled inspection.
What it checks
The scan reads install photos for that project and matches them against the Expedite Playbook:
- Disconnect placard present and labeled
- Rapid shutdown labels at panel + roof access
- Bonding photos
- Conductor color coding visible
- Inverter nameplate readable
- (And any AHJ-specific items)
Missing items become a T-3 readiness task on the project, routed to the PM.
Workflow
Pip drafts a readiness task
Lands in Buddies inbox if Copilot, or auto-creates if Autopilot.
PM reviews the gap list
A short bullet list of what's missing vs the playbook.
QS verifies on site
The Quality Surveyor adds missing photos or labels before the inspector arrives.
Mark resolved
Tick each item; the task closes when all are checked.
Why a Buddy and not a checklist
The playbook is fed by historical fail reasons per AHJ. As more inspections accumulate, the playbook updates automatically — you don't have to maintain a per-AHJ checklist by hand.
Related
AHJ Intelligence
How SunrAI builds a profile per AHJ — pass rates, contacts, interconnection timelines — and how Pip uses it to flag risky inspections before install day.
Approving and undoing Buddy work